Packaging: | 25 kg per bag (M300) |
---|---|
10 litre & 20 litre per pail (CM80) | |
Consumption: | ± 4 kg per sq mtr (M300) |
7 - 10 sq mtr per litre (CM80) |
SURFACE PREPARATION
Prepare and lay the fresh concrete as per requirements. Note that the concrete must be a minimum of G25 or compressive strength of 25 N/mm².
Deposit the concrete between previously placed. Move concrete into place with shovels. Vibrators when used shall be inserted vertically to consolidate the concrete. Immediately behind the screeding operation, the concrete is further leveled and consolidated with a bull float.
APPLICATION - M300 (Non-colour)
Dry shake the M300 evenly over the surface. The dry shake materials will absorb some moisture from the freshly prepared concrete and should then be thoroughly floated into the surface, preferably by a bull float. Do not over trowel initial stage of concrete placement. Bleed water will cause color variations.
APPLICATION - Groove Line
The work area to be done will be using guide-rail follow by the anti-slip groove line to form the required groove dimension. The tools will be used to run from side to side of the concrete surface. Continuously pulling the tools away from the application, the lifting it & setting the tools back on the front side of the concrete surface and repeat the process to finish.
CURING - CM80
Upon completion, apply 1 coat of MASTERPAV Curing Compound (CM80).
Refer to product: