DECORATIVE CONCRETE COATING
MASTERPAV Metallic Epoxy System is designed to provide a stunning color brilliance with marble-effect finish. Depending on the desired finish, different unique design can be created by manipulation of the application technique. The durability, color variation and customizability make them a saught-after choice for flooring and countertop coating.
PACKAGING
MASTERPAV EC10 SF EPOXY PRIMER
4.5 & 1.0 kg/set
MASTERPAV EC19 SF METALLIC EPOXY COATING
4 & 20kg/set
CONSUMPTION & COVERAGE
MASTERPAV EC10 SF EPOXY PRIMER
0.3kg/m2
MASTERPAV EC19 SF METALLIC EPOXY COATING
2.0kg/m2
SURFACE PREPARATION
a)The concrete surface to receive the MASTERPAV EC19 SF Metallic Epoxy Coating shall be subjected to mechanical grinding to achieve a concrete surface profile (CSP) 1 – 3 as recommended by ICRI.
b)It is recommended to conduct concrete moisture test before application of MASTERPAV EC19 SF Metallic Epoxy Coating. Concrete substrate shall have moisture content of maximum 4%. For concrete substrate with moisture content higher than 4%, a moisture barrier is recommended.
c)All cracks are to be rectify before actual application.
PRIMER: MASTERPAV EC10
a)Pour the entire content of Part B into Part A of MASTERPAV EC10.
b)Mechanically mix the mixture using low power mixer until homogeneous.
c)Apply the mixed material using suitable roller and allow it to dry overnight.
TOPCOAT: MASTERPAV EC19
a)The previously applied primer should be cured, dry to the touch, and no longer tacky.
b)Light sanding the surface (promotes good bond between coats), follows by vacuuming.
c)Wipe clean the dust using a microfiber wipe with a suitable solvent (eg: MASTERPAV Thinner 101)
d)Pour the entire content of Part B into Part A of MASTERPAV EC19 SF Metallic Epoxy Coating.
e)Mechanically mix the mixture using low power mixer until homogeneous.
f)Divide the mixed epoxy into 2 cups and add color to each one (Cup 1: Base color, Cup 2: Highlight color). Cup 1 should be the main base color and have most of the epoxy, while Cup 2 should be your highlight color and have less epoxy.
g)For every 4kg (A+B) epoxy resin, 1 pack of MASTERPAV Metallic pigments (100g) is recommended.
h)Pour out the main base color which have most of the epoxy and spread it using 2mm notched floor squeegee.
i)Add the desired highlight color to your base color epoxy.
j)Use microfiber roller (lint-free) to blend the base and highlight epoxy to customize the design.
k)The floor will keep self-levelling for hours. Allow the floor to cure 24 hours before you allow anyone step on it. (Pro tips: Spray 91% isopropyl alcohol 15 minutes after application to get rid of air bubbles in the epoxy surface).
l)The MASTERPAV EC19 SF Metallic Epoxy Coating need appox. 2.0kg for every m2 of the project.
m)It is advised not to disturb the poured resin 30 minutes after part A + B has been mixed (working time).
CAUTION! DO NOT LEAVE MIXED PRODUCT IN A BUCKET. THIS WILL CAUSE A FASTER CHEMICAL REACTION & THE EPOXY WILL THICKEN FASTER THAN IT SHOULD. THIS WILL COMPROMISE THE WORKING TIME. REFER TO POT LIFE DATA BEFORE USE.
PROTECTION
After application, it is recommended that the coated surface shall be protected from:
a)Foot traffic for a minimum of 24 hours after application;
b)Light vehicle traffic for a minimum of 7 days after application;